NEWTON NORTH HIGH SCHOOL AND ELM RD RECONSTRUCTION
- Guigli
- August 21, 2045
Newton North High School, formerly Newton High School, is the larger and longer-established of two public high schools in Newton, Massachusetts, with about 1,800 students, the other being Newton South High School.
NORWOOD HIGH SCHOOL
- Guigli
- December 29, 2040
Construction of a New High School on a 25 Acre Site with Large Scale Underground Utilities, Unsuitable & Contaminated Soil Removal, New Foundations, New Parking Lots, Roadways, Playing Fields & Tennis Courts.
CAMP EDWARDS UNIT TRAINING EQUIPMENT SITE
- Guigli
- April 21, 2033
26 Acre Military Equipment Training and Testing Facility on a Secure Military Base. Mass Earthwork, Large Scale Drainage & Utilities.
AMERICAN TOWER RELOCATION
- Guigli
- December 28, 2032
Ledge Blasting, Earthwork & Access Road for a new Communications Tower for American Tower.
McMULLEN MUSEUM, BOSTON COLLEGE
- Guigli
- December 28, 2031
Underpinning, Earth Support, Interior Rock Removal by Remote Controlled Demolition Robot, Material Processing, New Utilities, Pond, Roadways and Site Improvements for a Renovation and New Addition.
TOZZER LIBRARY, HARVARD COLLEGE
- Guigli
- December 28, 2030
Soldier Pile & Lagging, Underpinning and Interior Plumbing within Existing Library, Contaminated Soil Disposal Trucked to Scarborough Maine, Excavations Directly Adjacent to an Existing High Pressure Steam Line, Exterior Improvements and Other Sitework.
WORCESTER STATE UNIVERSITY NEW RESIDENCE
- Guigli
- April 28, 2030
30,000 tons of Contaminated Soil Removal & Disposal Trucked to Scarborough Maine, Terraced Retaining Walls, Large Scale Utilities and Deep Foundations for a New Residence Hall.