NORWOOD HIGH SCHOOL

Construction of a New High School on a 25 Acre Site with Large Scale Underground Utilities, Unsuitable & Contaminated Soil Removal, New Foundations, New Parking Lots, Roadways, Playing Fields & Tennis Courts.

  • Posted On
Read more

COLLICOT- CUNNINGHAM SCH0OL

Shored Deep Culvert Re-Route, Sewer Bypass, Deep Sanitary Lift Station, Groundwater Control, Retaining Wall Construction, Earthwork & Utilities for a New School.

  • Posted On
Read more

AYER SHIRLEY HIGH SCHOOL

Guigli Accelerated a 2 Year Sitework Schedule into a 2.5 Month Summer Break. This Included All Site Demolition, Blasting, Material Processing, Mass Earthwork, New Utilities, Reclaimed Gravel Bases, Roadways, Parking Lots, Curbing, Sidewalks & Loaming...

  • Posted On
Read more

ANGIER SCHOOL

Complete Site Package for a New Elementary School Abutting Existing MBTA Tracks.

  • Posted On
Read more

QUINCY CITY HALL

Deep Hole Excavation & Scale Pan Removal, Deep Utility Installation, Deep Wood Lagged Utility Connections into Hancock Street, Interior Plumbing within Existing Building.

  • Posted On
Read more

LINCOLN STREET SCHOOL

Guigli Accelerated a 2 Year Sitework Schedule into a 2.5 Month Summer Break. This Included All Site Demolition, New Utilities, Earthwork, Gravel, Roadways, Parking Lots, Curbing, Sidewalks & Loaming for Student Accessibility in Time for the 2015 Scho...

  • Posted On
Read more