NORWOOD HIGH SCHOOL
Construction of a New High School on a 25 Acre Site with Large Scale Underground Utilities, Unsuitable & Contaminated Soil Removal, New Foundations, New Parking Lots, Roadways, Playing Fields & Tennis Courts.
COLLICOT- CUNNINGHAM SCH0OL
Shored Deep Culvert Re-Route, Sewer Bypass, Deep Sanitary Lift Station, Groundwater Control, Retaining Wall Construction, Earthwork & Utilities for a New School.
AYER SHIRLEY HIGH SCHOOL
Guigli Accelerated a 2 Year Sitework Schedule into a 2.5 Month Summer Break. This Included All Site Demolition, Blasting, Material Processing, Mass Earthwork, New Utilities, Reclaimed Gravel Bases, Roadways, Parking Lots, Curbing, Sidewalks & Loaming...
ANGIER SCHOOL
Complete Site Package for a New Elementary School Abutting Existing MBTA Tracks.
QUINCY CITY HALL
Deep Hole Excavation & Scale Pan Removal, Deep Utility Installation, Deep Wood Lagged Utility Connections into Hancock Street, Interior Plumbing within Existing Building.
LINCOLN STREET SCHOOL
Guigli Accelerated a 2 Year Sitework Schedule into a 2.5 Month Summer Break. This Included All Site Demolition, New Utilities, Earthwork, Gravel, Roadways, Parking Lots, Curbing, Sidewalks & Loaming for Student Accessibility in Time for the 2015 Scho...
DIVISION OF FISHERIES & WILDLIFE HQ
Unsuitable Removal & Replacement, Deep Foundations, Utilities & Sitework.
STEINBRENNER TRACK, M.I.T.
Site Prep, Drainage and Precision Grading for Olympic Rated Track and Field.