WORCESTER STATE UNIVERSITY NEW RESIDENCE
30,000 tons of Contaminated Soil Removal & Disposal Trucked to Scarborough Maine, Terraced Retaining Walls, Large Scale Utilities and Deep Foundations for a New Residence Hall.
FRAMINGHAM STATE NEW RESIDENCE HALL
Geothermal Wells & Field, Deep Foundation Excavation for New Residence Hall, Utilities & University Gateway Park
BRIDGEWATER STATE WEYGAND HALL
Geothermal Wells & Field, Groundwater Dewatering & Treatment, New Residence Hall, Utilities & Parking Lot
MIT BOILER PLANT
Pile Cap Removal, Pre-Trenching and Assistance for Pile Drilling Operations, Water Management, Grout/Slurry Segregation & Disposal, Contaminated Soil Removal & Disposal, Decontamination Procedures, New Pile Cap Prep. Foundations & Paving for a...
McMULLEN MUSEUM, BOSTON COLLEGE
Underpinning, Earth Support, Interior Rock Removal by Remote Controlled Demolition Robot, Material Processing, New Utilities, Pond, Roadways and Site Improvements for a Renovation and New Addition.
TOZZER LIBRARY, HARVARD COLLEGE
Soldier Pile & Lagging, Underpinning and Interior Plumbing within Existing Library, Contaminated Soil Disposal Trucked to Scarborough Maine, Excavations Directly Adjacent to an Existing High Pressure Steam Line, Exterior Improvements and Other Sitewo...
MIT RECYCLING FACILITY
New Salt Sheds, Utilities, Paving and Other Sitework for MIT’s New Recycling Facility
BROOKS SCHOOL CHAPEL RENOVATION
Underpinning Below Existing Footings, Interior Plumbing Within the Existing Chapel and Associated Perimeter Sitework.
ADOBE HEADQUARTERS
Sensitive Ledge Blasting within 100′ of Route 128, Daily 10 Lane Rolling Traffic Stops for Route 128, Material Processing, Deep Utility Relocation, Roadway Reconstruction for Adobe’s Headquarters and Associated Parking Structure.